Copper · Gold · Silver · Zinc
B26
Abitibi Metals Corp. CSE: AMQ
- Best intercept
- 60.2 m @ 1.25% CuEq (incl. 9.2 m @ 3.72% CuEq) ↗ Released Sep 17, 2026
- Metres drilled
- 8,232 m metres completed as of April 7, 2026 (deposit drilling since year restart); Phase 4 targeting up to 40,000 m
- Last update
Program timeline
- 04 Assay results
Hole 1274-25-366-W1 intersected 1.25% CuEq over 60.2 m, including 2.45% CuEq over 18.8 m and 3.72% CuEq over 9.2 m. Additional WDP wedges included 1.45% CuEq over 14.1 m in 1274-26-378W2. Up to three rigs remained on site.
Source: Company IR ↗ - 03 Assay results
A 3,285 m regional program (four holes) intersected a new Zn-Ag zone 1.5 km west of B26 in hole 1274-26-383 (14.25 m at 1.13% Zn and 51.51 g/t Ag) and Au-Ag-Zn mineralisation on a parallel trend. Drilling resumed after a wildfire-related pause.
Source: Newsfile ↗ - 02 Assay results
Western Down-Plunge step-out hole 1274-25-373W4 returned 1.81% CuEq over 15 m including 2.71% CuEq over 7 m from 1,346 m depth. The company reported 8,232 m completed since the year restart and planned a third rig.
Source: Newsfile ↗ - 01 Program start
Abitibi launched Phase 4 at B26, planning up to 40,000 m in 2026 with an initial winter component of about 15,000–20,000 m and expansion from one to three rigs for resource improvement, expansion and regional drilling.
Source: Newsfile ↗
About the project
B26 is a polymetallic copper-gold-zinc-silver deposit in Québec’s Abitibi greenstone belt, about 7 km from the former Selbaie mine. Abitibi holds 100% interest following its option earn-in from SOQUEM.
Phase 4 is the company’s largest program to date, combining resource conversion, down-plunge and lateral expansion, and regional discovery metres. September 2026 results included one of the stronger CuEq intercepts of the year on the eastern side of the deposit, with drilling still underway.
Log the next program in one database.
Blue Butterfly is core logging software built by geologists — validation at entry, live strip logs, and assay imports that line up with your intervals.
- 01 One live database, no version conflicts
- 02 Built-in strip logs and 3D drill hole viewer
- 03 Per-project pricing, not per-seat
Free during beta · No credit card
Related programs
Summaries of public disclosures by Abitibi Metals Corp. . The original sources linked above are the source of truth. This page is not investment advice and does not imply endorsement by Blue Butterfly.
Report a correction →